Monday, March 15, 2010

Bedard Dyke - body of work

I have restated feet to metres for prior drill holes.

Widths for recent drill holes (2655-1A, 2700-1, 2700-2, 2610-7, 2610-8) are stated as True Width.


1) Drill hole 18755 (historical hole, published in 2005):
--->26.39 (m) @ 12.80 (g/t) Au

2) Drill hole 18803 (historical hole, published in 2005):
--->65.85 (m) @ 14.90 (g/t) Au

3) There was a successful confirmation hole drilled at some point between 2005 and 2007 which confirmed a number of high grade zones going down the Bedard Dyke structure. The hole was discussed by the independent consultants in the independent (bankable) DD report. It was also referenced in Century presentations and conference calls. However, I am unable to compile the data in this summary, as results were never published. It is my belief that this was a privotal hole, as it provided vital infomation used in setting up the drill program - a very successful drill program.

4) Drill hole 2610-1:
--->0.40 (m) @ 8.59 (g/t) Au
and 1.22 (m) @ 14.35 (g/t) Au
and 1.77 (m) @ 13.74 (g/t) Au

5) Drill hole 2610-2:
--->3.08 (m) @ 11.19 (g/t) Au
and 2.77 (m) @ 3.19 (g/t) Au
and 7.80 (m) @ 2.73 (g/t) Au

6) Drill hole 2610-3:
``Negligible``

7) Drill hole 2610-4:
--->2.38 (m) @ 3.73 (g/t) Au

8) Drill hole 2610-5:
``Negligible``

9) Drill hole 2610-6:
``Negligible``

10) Drill hole 2655-2:
--->0.91 (m) @ 2.27 (g/t) Au
and 0.64 (m) @ 12.15 (g/t) Au

11) Drill hole 2745-1:
--->2.26 (m) @ 35.00 (g/t) Au
and 0.58 (m) @ 8.92 (g/t) Au

12) Drill hole 2745-2:
--->0.79 (m) @ 6.84 (g/t) Au
and 1.19 (m) @ 2.44 (g/t) Au
and 2.38 (m) @ 6.98 (g/t) Au

13) Drill hole 2745-3:
--->0.49 (m) @ 5.11 (g/t) Au

14) Drill hole 2790-1:
--->2.99 (m) @ 10.72 (g/t) Au
and 0.40 (m) @ 24.00 (g/t) Au

15) Drill hole 2790-2:
--->0.49 (m) @ 8.87 (g/t) Au

16) Drill hole 2790-3:
--->0.61 (m) @ 5.55 (g/t) Au
and 3.63 (m) @ 5.59 (g/t) Au
and 1.46 (m) @ 3.45 (g/t) Au

17) Drill hole 2655-1A:
--->0.73 (m) @ 4.29 (g/t) Au
and 1.40 (m) @ 7.72 (g/t) Au
and 0.70 (m) @ 5.10 (g/t) Au
and 0.87 (m) @ 10.10 (g/t) Au

18) Drill hole 2700-1:
--->2.19 (m) @ 2.89 (g/t) Au
and 5.28 (m) @ 9.56 (g/t) Au
and 1.32 (m) @ 3.61 (g/t) Au
and 1.94 (m) @ 3.06 (g/t) Au

19) Drill hole 2700-2:
--->0.40 (m) @ 2.29 (g/t) Au
and 0.86 (m) @ 3.17 (g/t) Au
and 0.54 (m) @ 4.19 (g/t) Au
and 0.33 (m) @ 2.14 (g/t) Au

20) Drill hole 2610-7:
--->2.15 (m) @ 2.55 (g/t) Au
and 1.92 (m) @ 10.06 (g/t) Au
and 0.61 (m) @ 6.14 (g/t) Au
and 1.96 (m) @100.50 (g/t) Au
and 0.87 (m) @ 7.63 (g/t) Au
and 0.72 (m) @ 25.20 (g/t) Au
and 0.88 (m) @ 4.84 (g/t) Au

21) Drill hole 2610-8:
--->2.67 (m) @ 14.17 (g/t) Au
and 0.73 (m) @ 4.29 (g/t) Au
and 1.40 (m) @ 7.72 (g/t) Au
and 0.66 (m) @ 38.20 (g/t) Au
and 0.37 (m) @ 6.66 (g/t) Au
and 1.85 (m) @ 2.79 (g/t) Au

22) Drill hole 2610-9:
Visible gold identified - results to be published once assay data arrives back.

23) Drill hole 2610-10:
Visible gold identified - results to be published once assay data arrives back.

24) Drill hole 2610-11:
Visible gold identified - results to be published once assay data arrives back.

No comments: